FY24 Cis Hullboard Lagging Work, Uss Pearl Harbor
AwardedCoastal Marine Services, INC. won a $123,510 drywall & insulation contract from Department of Defense (Department Of The Navy), for work in San Diego, California. 1 offer was received (competed among a restricted group (set-aside)). The period of performance runs about 19 days.
Scope of work
Federal category: Non-nuclear Ship Repair (west) (PSC J999).
How competitive was this award?
- Offers received 1 vs. 2.7 on average for drywall & insulation awards in our data: a single bidder, which is rare enough to be worth noting
- Competition Competed among a restricted group (set-aside)
- Pricing Firm fixed price: the contractor agreed a set price up front
- Contract type Delivery Order
Contract size in context
At $123,510, this is larger than 91% of the 368 drywall & insulation awards we track (median $11,246). Department of Defense's median drywall & insulation award is $6,790 across 235 awards.
Timeline
- Signed 2024-04-01
- Starts 2024-04-03
- Ends 2024-04-22
About the winner
Coastal Marine Services, INC. is based in San Diego, CA and is designated a small business. We track 72 federal awards to this company.
Original solicitation
This work was bid under solicitation N5523620R0001. Find the original notice →
Verify this award on the official record →
Other awards to Coastal Marine Services, INC.
- FY24 Cis Hullboard Lagging Work, Uss Princeton$197,323 · Department of Defense
- FY25 Hullboard Removal, Repair and Installation, Uss Tripoli$184,563 · Department of Defense
- FY25 Hullboard Removal, Repair and Fabrication, Uss Harpers Ferry$109,911 · Department of Defense
- FY26 Hullboard Removal, Repair and Installation, Uss Momsen (ddg 92)$90,924 · Department of Defense
- FY25 Hullboard Removal, Repair and Installation, Uss Russell$84,664 · Department of Defense
Similar drywall & insulation awards from Department of Defense
- Award of Base and Options 1A East Shop Shell, Option 2A West Shop Shell, and Option 5 Insu$50,819,615 · Cianbro- Az A Joint Venture
- This Is a Continued Contract from$1,759,852 · Sussex Rural Electric Cooperative
- Repair Pool Plaster @ Bldg 1576$1,569,463 · W E S T Development, INC.
- Nww Hq Building Fire Barrier Upgrades$413,299 · Tri Coast Construction, LLC
- Bldg 4215 Mold Remidiation$360,288 · Coles Group (The) LLC
More drywall & insulation awards in California
- Emergency Mitigation Post Water/sewage Leak. Eo 14398 Implementing Eo 14398 Dei Discrimina$197,835 · Strategic Industry INC
- FY24 Cis Hullboard Lagging Work, Uss Princeton$197,323 · Coastal Marine Services, INC.
- FY25 Hullboard Removal, Repair and Installation, Uss Tripoli$184,563 · Coastal Marine Services, INC.
- Soundproofing Walls and Installation$110,400 · Soundproof San Diego INC
- FY25 Hullboard Removal, Repair and Fabrication, Uss Harpers Ferry$109,911 · Coastal Marine Services, INC.