United States › Open bids › FY27 NRM - VISN Base Install Roof Equipment Railin

FY27 NRM - VISN Base Install Roof Equipment Railings - 539-22-206

Early notice

A Department of Veterans Affairs presolicitation for roofing work, set aside for: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14). Responses are due 2026-11-30 (17 days left).

AgencyDepartment of Veterans Affairs
OfficeVeterans Affairs, Department of · 250-Network Contract Office 10 (36c250)
Response deadline2026-11-3017 days left
Posted2026-11-08
Notice typePresolicitation
Set-asideService-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Place of performanceNot stated
Solicitation no.36C25027B0008
CategoryNAICS 236220 · PSC Z1DA

What this notice means

A heads-up that a solicitation is planned. The agency is usually not accepting bids yet, but this is the time to get ready and register.

What the agency is asking for

Construction statement of work

Install Roof Equipment Railings Project No. 539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including:

  • prepare site for building operations
  • demolition and removal of existing structures
  • furnish labor
  • materials
  • perform work as required by drawings
  • specifications

Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA.

This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project.

It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.

Requirements mentioned in the notice

  • Bonding & bid security “539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including pr…”

Extracted from the notice text. Always read the full solicitation documents for the exact requirements.

View the official notice →

Bids are submitted through the channel named in the official notice. BidsNear does not accept bids.

Get bids like this by email. Free alerts for roofing work. Set up alerts

Recent awards for similar work

Past federal awards show who wins this kind of work and at what size.