Pensacola Harbor Navigation Channel Maintenance Dredging

Live Open for bids

The Department of Defense solicitation for construction work. Responses are due 2026-11-20 (7 days left).

AgencyDepartment of Defense
OfficeDept of the Army · W074 Endist Mobile
Response deadline2026-11-207 days left
Posted2026-11-10
Notice typeSolicitation
Set-asideNone stated
Place of performanceNot stated
Solicitation no.W9127827BA002
CategoryNAICS 237990 · PSC Y1KF

What this notice means

A formal request for bids or proposals. Contractors can submit an offer before the closing date.

What the agency is asking for

This requirement is for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 30 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation.

The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach.

View the official notice →