Roof Replacement & Repair on building: BC18, BC19, BC20, BC23, BC24, BC25, and FBE

Closed

Correctional Services of Canada sought bids for this roofing requirement. Open bidding: any qualified supplier can submit a bid. The lowest compliant price wins. Bidders had 45 days between publication and closing.

BuyerCorrectional Services of Canada
Delivery regionBracebridge, Collingwood, Huntsville, Gravenhurst
Closing date2023-10-13 11:00
Published2023-08-29
TradeRoofing
Solicitation no.21422-24-4484526

Key dates

  • Published August 29, 2023 1172 days ago
  • Bids close October 13, 2023 1127 days ago
  • Contract starts October 12, 2023 1128 days ago
  • Contract ends March 29, 2024 959 days ago

Planned duration: about 6 months.

What the buyer is asking for

The Correctional Service Canada has a requirement to replace the asphalt shingles on buildings: BC18, BC19, BC20, BC23, BC24, BC25, and FBE with standing seam steel roofing. The Contractor must:

  • Remove and dispose of the existing shingles, vents, flashing, soffit, and facia
  • Inspect the existing roof for damage and make the repairs as required. The Contractor must obtain the Project Authority’s written approval before proceeding with any repairs
  • Seal entire roof surfaces using a self-adhering weather stop membrane material
  • Supply and install a new snap-lock standing seam roof system. Provide all necessary accessories, ridges, hips, valleys, corners, flashing, closure members and fasteners to ensure weather tight installation
  • Provide roof panels that are between 16” and 24” wide and have a 24-gauge thickness. The panels must be base coated to inhibit rust and top coated with Kynar paint. The seams must be between 1.5” and 2” high
  • Provide roof clips and fasteners must be corrosion resistant
  • Supply and install new vents, flashings, soffit, and metal facia coverings to match the new roof colour. The Site Authority will determine the colour of the roof panels, flashing, soffit, and facia before the contractor begins any work
  • Supply and install the appropriate sealing materials to complete a weather tight finish to all areas of the roof
  • Supply and install new snow stops to all roof edges as per manufactures recommendations
  • Install all materials as per the manufactures recommendations and specifications. All materials must be new
  • Clean all areas around the building removing all scrap and debris from the project site each day of work
  • Provide a warranty with a minimum of 25 years on the coating and weather tightness. Supply in writing, warranties or guaranties covering materials and of the new roofs to the Site Authority

Who can bid and how it is decided

  • Process Competitive - Open bidding Open bidding: any qualified supplier can submit a bid.
  • How the winner is chosen Lowest Price The lowest compliant price wins.
  • Trade agreements Canadian Free Trade
  • Goods & services category Roofing and siding and sheet metal work, Roofing installation or repair, Roofing and siding and sheet metal services, Roofing service